欧美大屁股xxxx,国产成人无码免费看片软件,国产小受呻吟GV视频在线观看 ,真人做人试看60分钟免费视频

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.sud-inc.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

臨邊護(hù)欄防護(hù)作業(yè)操作的事項介紹

來源:http://m.sud-inc.com/   發(fā)布時間:2024-03-13

在臨邊護(hù)欄作業(yè)施工時重要的是,大于一切,但盡管三令五申強(qiáng)調(diào)作業(yè),但還是有很多企業(yè)違反規(guī)定沒有按照政策去施工,導(dǎo)致了生產(chǎn)問題時有發(fā)生,給和社會造成很大損失。因此頒布臨邊洞口作業(yè)施工標(biāo)準(zhǔn)規(guī)范工地操作施工,這是繼91年標(biāo)準(zhǔn)后2016年新的基本規(guī)定。

When working on edge guardrails, it is important to prioritize safety. Safety is paramount. Despite the country's repeated emphasis on safe operations, many enterprises still violate regulations and fail to follow national policies, resulting in frequent safety production issues and causing significant losses to the country and society. Therefore, the country has issued construction standards for edge opening operations to regulate the safe operation and construction of construction sites, which is a new basic regulation in 2016 following the 91 year standard.

1 建筑施工中凡涉及臨邊與洞口作業(yè)、攀登與懸空作業(yè)、操作平臺、交叉作業(yè)及網(wǎng)搭設(shè)的,應(yīng)在施工組織設(shè)計或施工方案中制定高處作業(yè)技術(shù)措施。

For construction involving edge and hole operations, climbing and suspended operations, operating platforms, cross operations, and safety net installation, safety technical measures for high-altitude operations should be formulated in the construction organization design or construction plan.

2 高處作業(yè)施工前,應(yīng)按類別對防護(hù)設(shè)施進(jìn)行檢查、驗收,驗收合格后方可進(jìn)行作業(yè),并應(yīng)做驗收記錄。驗收可分層或分階段進(jìn)行。

20230315030529840.jpg

Before carrying out high-altitude operations, safety protection facilities should be inspected and accepted according to their categories. Only after passing the acceptance can operations be carried out, and acceptance records should be kept. Acceptance can be carried out in layers or stages.

3 高處作業(yè)施工前,應(yīng)對作業(yè)人員進(jìn)行技術(shù)交底,并應(yīng)記錄。應(yīng)對初次作業(yè)人員進(jìn)行培訓(xùn)。

Before carrying out high-altitude operations, safety technical briefing should be conducted to the workers and recorded. Training should be provided to first-time workers.

4 應(yīng)根據(jù)要求將各類警示標(biāo)志懸掛于施工現(xiàn)場各相應(yīng)部位,夜間應(yīng)設(shè)紅燈警示。高處作業(yè)施工前,應(yīng)檢查高處作業(yè)的標(biāo)志、工具、儀表、電氣設(shè)施和設(shè)備,確認(rèn)其完好后,方可進(jìn)行施工。

4. Various safety warning signs should be hung at the corresponding parts of the construction site according to requirements, and red lights should be set up for warning at night. Before carrying out high-altitude operations, safety signs, tools, instruments, electrical facilities, and equipment for high-altitude operations should be checked and confirmed to be in good condition before construction can proceed.

5 高處作業(yè)人員應(yīng)根據(jù)作業(yè)的實際情況配備相應(yīng)的高處作業(yè)防護(hù)用品,并應(yīng)按規(guī)定正確佩戴和使用相應(yīng)的防護(hù)用品、用具。

5. High altitude workers should be equipped with corresponding safety protection equipment according to the actual situation of the work, and should correctly wear and use the corresponding safety protection equipment and tools according to regulations.

6 對施工作業(yè)現(xiàn)場可能墜落的物料,應(yīng)及時拆除或采取固定措施。高處作業(yè)所用的物料應(yīng)堆放平穩(wěn),不得妨礙通行和裝卸。工具應(yīng)隨手放入工具袋;作業(yè)中的走道、通道板和登高用具,應(yīng)隨時清理干凈;拆卸下的物料及余料和廢料應(yīng)及時清理運走,不得隨意放置或向下丟棄。傳遞物料時不得拋擲。

6 pairs of materials that may fall on the construction site should be promptly removed or fixed measures taken. The materials used for high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading. Tools should be easily placed in a tool bag; The walkways, walkways, and high-altitude equipment used in homework should be cleaned at all times; The dismantled materials, surplus materials, and waste materials should be cleaned and transported away in a timely manner, and should not be arbitrarily placed or discarded downwards. Do not throw materials during transfer.

7 高處作業(yè)應(yīng)按現(xiàn)行標(biāo)準(zhǔn)《建設(shè)工程施工現(xiàn)場消防技術(shù)規(guī)范》GB 50720的規(guī)定,采取防火措施。

7. Fire prevention measures should be taken for high-altitude operations in accordance with the current national standard GB 50720 Technical Code for Fire Safety at Construction Sites.

8 在雨、霜、霧、雪等天氣進(jìn)行高處作業(yè)時,應(yīng)采取防滑、防凍和防雷措施,并應(yīng)及時作業(yè)面上的水、冰、雪、霜。當(dāng)遇有6級及以上強(qiáng)風(fēng)、濃霧、沙塵暴等惡劣氣候,不得進(jìn)行露天攀登與懸空高處作業(yè)。雨雪天氣后,應(yīng)對高處作業(yè)設(shè)施進(jìn)行檢查,當(dāng)發(fā)現(xiàn)有松動、變形、損壞或脫落等現(xiàn)象時,應(yīng)立即修理完善,維修合格后方可使用。

When working at heights in rainy, frosty, foggy, snowy or other weather conditions, anti slip, anti freezing, and lightning protection measures should be taken, and water, ice, snow, and frost should be promptly removed from the work surface. When encountering severe weather conditions such as strong winds of level 6 or above, dense fog, and sandstorms, outdoor climbing and suspended high-altitude operations are not allowed. After rainy and snowy weather, safety facilities for high-altitude operations should be inspected. If any looseness, deformation, damage or detachment are found, they should be repaired and improved immediately. Only after passing the repair can they be used.

9 對需臨時拆除或變動的防護(hù)設(shè)施,應(yīng)采取可靠措施,作業(yè)后應(yīng)立即恢復(fù)。

Reliable measures should be taken for safety protection facilities that need to be temporarily dismantled or changed, and they should be restored immediately after operation.

本文由工地圍擋提供幫助,更多的相關(guān)內(nèi)容請點擊http://m.sud-inc.com希望本文能夠為您帶來幫助,感謝您的閱讀!

This article is provided by the construction site fence for assistance. For more related content, please click on http://m.sud-inc.com I hope this article can be helpful to you. Thank you for reading!

性色AV蜜臀AV色欲AV| 艳妇臀荡乳欲伦交换| 蜜桃成人无码区免费视频网站| 国产一区二区三区精品视频| 日日噜噜夜夜狠狠久久人人| 久久精品一区二区三区AV| 无人高清视频完整版在线观看| 少妇啊灬啊灬用力啊快小熊| 欧美bbbwbbwbbwbbw| 青楼SAO货养成日记H| 国产老肥熟XXXX| 久久久久夜夜夜精品国产| 护士奶头又白又大又好摸视频| А中文在线天堂| 国产AV国产精品白丝JK制服| 高雅人妻被迫沦为玩物| 高清白胖肥妇BBWBBW| 熟女人妻一区二区三区免费看| 97精品一区二区视频在线观看| 精品人妻无码一区二区三区换脸| 久久精品国产99国产精2018 | 国产成人AAAAA级毛片| 色国产色无码色欧美色在线| 岳今晚让我玩个够肥水一体探岳体 | 久久精品国产精品亚洲色婷婷| 男人添女人囗交做爰视频| 免费午夜爽爽爽WWW视频十八禁| 被C到喷水嗯H| 狂躁女人双腿流白色液体| 老女人做爰全过程免费的视频| 韩国年轻漂亮岳每4乱理| 成人性生交大片免费看京东小视频| 丰满少妇弄高潮了WWW| 国产精品美女久久久| 精品人妻系列无码人妻免费视频| 久久国产精品久久久久久| china贵州少妇video| 狠狠噜天天噜日日噜| 欧美肥婆另类bbwbbw| 久久99精品久久久久久无毒不卡| 激情国产一区二区三区四区小说 |