欧美大屁股xxxx,国产成人无码免费看片软件,国产小受呻吟GV视频在线观看 ,真人做人试看60分钟免费视频

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.sud-inc.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

鋼筋加工棚的8點安裝事項

來源:http://m.sud-inc.com/   發(fā)布時間:2023-02-17

鋼筋加工棚是施工現(xiàn)場鋼筋調(diào)直、彎曲和焊接的場所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對接,(不要擰14個螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個螺絲)。否則,支架的孔沒有對齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時,確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個2.99米鉆尾,鋼筋加工棚4個2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://m.sud-inc.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://m.sud-inc.com consulting service

成人视频网站| 国产又爽又黄无码无遮挡在线观看 | 小婷的性放荡日记H| 成人乱码一区二区三区AV | CHINESE猛男粗GAY雷爷| 偷看农村女人做爰毛片色| 国产99久久久国产精品免费看| 凹凸久久人人澡超碰凹凸| 高中陪读房间的呻吟声| 亚洲成A人无码亚洲成AV无码| 机机对机机的30分钟免费软件| 97精品人妻系列无码人妻| 2022最新韩国理伦片在线观看| 99国产精品久久久久久久成人| 日韩欧美在线综合网| 国产乡下妇女做爰| 广东少妇大战黑人34厘米视频| 欧美顶级少妇做爰HD| 人妻无码久久一区二区三区免费| 亚洲精品无码久久毛片| 国产白嫩护士被弄高潮| 14MAY18XXXXXL日本| 久久久久人妻精品一区三寸蜜桃 | 香蕉久久一区二区不卡无毒影院| 闺房床榻粗喘H娇女| 天天躁日日躁狠狠躁AV中文| 男朋友整根进去了但我没感觉 | 国产精品无码午夜福利| 无套内谢少妇毛片A片999| 夜色88v精品国产亚洲av| 风流老熟女一区二区三区| 国产精品久久免费观看勾搭| 男人的天堂AV亚洲一区2区 | 疯狂揉肉蒂高潮H失禁视频| 老汉在瓜棚里玩二个丫头| 性色AV浪潮AV蜜桃AV| 国产午夜AV无码无片久久96| 亚洲AV无码一区二区乱子伦| 精品人妻人人做人人爽| 国产在线av一区二区麻豆董小宛| 性欧美XXXXX乱极品少妇|